Your 2026 imports already carry a carbon bill. It arrives in 2027.
What importers of cement, iron and steel, aluminium, fertilisers, electricity and hydrogen need to do before the first CBAM declaration on 30 September 2027.
Andrew O' Connor
A finance and tax professional who also runs a customs practice. Andrew files the declarations, classifies the goods and deals with Revenue and HMRC, so when a container is held at Dublin Port, he's often the one on the phone.
Declarations at the border
Customs declarations, tariff classification and import VAT for Irish and UK traders.
Numbers that stand up
Tax compliance, IFRS, Irish/UK and US GAAP, ERP, treasury, regulatory reporting and audit.
Straight to the source
Works with importers on CBAM and takes the open questions directly to the EPA's CBAM team.
Imported more than 50 tonnes of CBAM goods from outside the EU in 2026? You pay for the carbon in 2027.
CBAM puts the EU's carbon price on imports, so production can't just move abroad to avoid it
Carbon leakage
Carbon-intensive production could move to countries with weaker climate rules, and the emissions would simply happen somewhere else.
Same price as EU producers
EU plants pay for carbon under the EU Emissions Trading System (ETS). Importers buy CBAM certificates priced off the ETS. One certificate = one tonne of CO₂e.
Grows as free allowances end
EU producers lose their free ETS allowances between 2026 and 2034. As they do, importers pay for a larger share of the embedded carbon.
Six sectors, chosen because they carry the most carbon
Cement
Clinker, Portland and aluminous cement, cement for building and civil works
Iron and steel
Pig iron, sheet, bars, wire, tubes, structures, screws, bolts and fixings
Aluminium
Unwrought aluminium, bars, profiles, plates, foil, tubes and structures
Fertilisers
Ammonia, nitric acid, urea and nitrogen-based mixed fertilisers
Electricity
Imported electricity. No 50-tonne threshold.
Hydrogen
Imported hydrogen. No 50-tonne threshold.
importers in scope after the 2025 threshold change, with about 99% of imported emissions still covered.
From reporting to paying: where we are now
Transitional period: quarterly reports, no payment
Definitive period starts. 2026 imports count.
Apply by now to keep importing on your application reference
Certificate price published quarterly: 7 Apr, 6 Jul, 5 Oct, 4 Jan
Accredited verifiers get access to the CBAM Registry
Certificates on sale via the Common Central Platform
Hold certificates for ≥ 50% of the year's embedded emissions
First declaration and surrender for 2026 imports
Proposal About 180 downstream steel and aluminium products
Three bodies, three jobs. Know which one to ask.
EPA
- Grants and revokes Authorised CBAM Declarant status
- Sells CBAM certificates
- Compliance and enforcement
- Supports declarants (newsletter, guides, calculation tool)
Revenue
- The customs side of CBAM: declarations, TARIC codes, checks at import
- Customs queries: importpolicy@revenue.ie
European Commission
- CBAM Registry and the 50-tonne threshold monitoring
- Publishes the certificate price
- Runs the Common Central Platform from 2027
- Reviews declarations with the EPA
Over 50 tonnes? You must be an Authorised CBAM Declarant
- Apply on the Declarants Portal. Importers, or an indirect customs representative on their behalf. The EPA has a step-by-step guide and checklist.
- Answer EPA follow-up questions on time. Late replies hold up your authorisation.
- While pending: put your CBAM application reference on customs declarations with TARIC document code Y238.
- Once granted: use your CBAM account number with TARIC code Y128. You can then log in to the CBAM Registry.
Check every 2026 entry
Ask your broker for a list of your 2026 import entries with CN codes, net mass and the CBAM reference used. Missing or wrong references are far easier to fix now than in September 2027.
If you use an indirect representative, agree in writing who holds the CBAM obligation.
Five inputs decide how many certificates you buy
2026 is the cheapest year CBAM will ever be
Each year, less of the benchmark is deducted from your embedded emissions. The same tonnes from the same supplier cost more every year, even if the carbon price never moves.
Same 200 tonnes of steel. The bill depends on the year and on your supplier's data.
| Import year | Using default values (2.0 t CO₂e/t) | Using verified supplier data (1.6 t CO₂e/t) |
|---|---|---|
| 2026 | €10,160400 − 273 = 127 certificates | €3,760320 − 273 = 47 certificates |
| 2030 | €20,464400 − 144.2 = 255.8 certificates | €14,064320 − 144.2 = 175.8 certificates |
| 2034 | €32,000400 certificates, no deduction | €25,600320 certificates, no deduction |
Your supplier's emissions data is now a line on your cost sheet
Default values
Published by the Commission per product and country of origin. No supplier work needed, but they usually cost more than a good supplier's real figure.
Verified actual values
Must be certified by an accredited verifier before use in a declaration. That applies to your 2026 imports, declared in 2027.
The O3CI portal
Non-EU plants register on the Operators of Third Country Installations portal, upload installation and verified emissions data, and can share a summary with you.
From 2027, CBAM is a cash-flow item every quarter, not once a year
Common Central Platform
- Only Authorised CBAM Declarants can buy
- Ireland sells only to declarants established in Ireland
- Buy at any time during the year
- Price published weekly from 2027
The 50% rule
- At the end of each quarter from 2027, hold certificates covering at least 50% of the embedded emissions you've imported since 1 January
- Surrender the full amount with the annual declaration by 30 September
What isn't settled yet, straight from the EPA
Carbon price paid abroad
The deduction for carbon tax paid in the country of origin can't be applied yet. Asked by Andrew in September, the EPA replied that it is "still awaiting the secondary legislation for the carbon price paid in a third country."
Downstream extension
About 180 downstream steel and aluminium products, plus anti-circumvention rules, proposed from 1 January 2028. Machinery, fabrications and parts buyers should watch this.
Commission FAQ
The Commission's CBAM FAQ is being revised to reflect the 2025 changes. Check the date on any guidance you rely on.
UK CBAM, from 1 Jan 2027
A separate UK scheme run by HMRC, with a £50,000 importer threshold. Trading with Great Britain or Northern Ireland? Check both regimes.
Eight things to do before 30 September 2027
- Map your CN codes against Annex I or TARIC, for every non-EU supplier.
- Add up your 2026 tonnage across cement, iron and steel, aluminium and fertilisers.
- Confirm your authorisation and that each declaration carries Y238 or Y128 with the right reference.
- Ask suppliers for installation details, O3CI registration and a verification date.
- Estimate your liability with the EPA calculation tool once the Q4 price is out on 4 January.
- Plan cash for buying from 1 February and the quarterly 50% holding rule.
- Review contracts and pricing: who carries the carbon cost, and can it be passed on?
- Book the deadline: declaration and surrender by 30 September 2027.
CBAM is a data problem first. Keep the evidence with the order.
Truo Trade is the trade operating system for importers and exporters: one shared record for every order, its documents and its shipments. We are building the CBAM evidence trail into that record In development with partners
Every CBAM import, traceable
CN code, origin, net mass, supplier installation and emissions evidence, linked to the order and the customs entry.
Supplier requests with owners
Requests for installation data, O3CI registration and verification reports, each with an owner, a due date and a reminder.
For your declarant and adviser
Calculation inputs, review decisions and declaration history in one place, ready for whoever signs the declaration.
Questions?
Bring your CN codes, your 2026 tonnage and your supplier list. Those three answer most CBAM questions.
Truo Trade advisor
General information, not legal, tax or customs advice. CBAM rules, dates and prices change; check current requirements with the EPA, Revenue and the European Commission before acting. Sources: Regulation (EU) 2023/956 as amended; S.I. No. 539/2024; EPA CBAM Newsletter (March 2026); EPA correspondence with Andrew O' Connor (27 Aug and 28 Sep 2026).